Water and Sewerage
Wills Bros Ltd are one of the leading contractors in Ireland in this sector having completed a large number of high profile water and sewage contracts.
|
Ballyshannon Sewerage Scheme This contract involved the construction of the Ballyshannon Sewerage Scheme which included 17km of new pipework in the town of Ballyshannon. The new pipes were laid in busy streets while maintaining... read more » |
|
Clontarf Combined Sewers Overflow Tanks The construction of a temporary storage facility, within the confines of Clontarf Golf Club. Work included the installation of combined sewers in storm conditions and consisted of an R.C. storage tank... read more » |
|
Carlow Town Surface Water Drainage Scheme, Flood Relief Scheme Phase A and Water Conservation Project Phase 2 Upgrading of the existing sewerage network by constructing new storm and foul sewer lines, surface water and overflow chambers and pumping stations around the town of Carlow. Watermain... read more » |
|
Killooman-Ballinagleragh Water Supply Project The project encompassed the construction of: • 3 No reinforced concrete reservoirs were constructed. The reservoirs consist of pre-cast concrete wall panels, columns and insitu base, ring beam... read more » |
|
Glenbeg Water Treatment Works Construction of a new Water Treatment Plant and associated site works to treat the water supplied to Castletownbere and its environs. The proposed development is to be located in lands West of... read more » |
|
A92 Eden Bridge Drainage Works Carriageway and drainage works carried out on the A92 in Fife from the Eden Bridge southbound. Earthworks to strengthen carriageway foundations. It involved excavations up to 2-3m deep and... read more » |
|
Carysfort - Maretimo Stream Improvement Scheme The Carysfort Maretimo Stream has caused a number of severe flooding incidents in the past decade. The most recent flooding events have occurred on the 17th July 2007 and the 2nd July 2009. The... read more » |
|
WHINNEY HILL LANDFILL SITE PHASE 7.3 CONSTRUCTION WORKS INCLUDING PHASE 7.1 & PHASE 7.2 LINK WORKS THE PREPARATION OF PHASE 7.1 AND 7.2 LINK WORKS COMPRISED OF • Excavation and land forming • Earthworks to facilitate surface water management • The application of a composite... read more » |
|
River Fergus (Lower) Certified Drainage Scheme The works include: Site Preparation and Finishing Work. Deconstruction and rehabilitation of existing stone walls at the locations detailed on the drawings and construction of new stone faced... read more » |