Earthworks

Wills Bros Ltd specialise in earthmoving operations from bulk excavation to vertical drainage solutions. Owning one of the largest fleets of earthmoving equipment in Ireland, Wills Bros Ltd has the capability, resources and experience to provide cost effective high volume operations efficiently.

M3 Clonee to North of Kells Earthworks

The M3 motorway is the largest PPP motorway project undertaken in Ireland. Wills Bros Ltd was engaged as the specialist earthworks contractor by the main contractor for 32km (over 50%) of the project...

read more »
M3 Clonee to North of Kells Earthworks
M50 Upgrade Scheme Contract 1

The M50 Upgrade Scheme involved the provision of a third lane in each direction and the change of all signalized grade separated interchanges to fully free-flow junctions. Contract 1 involved the...

read more »
M50 Upgrade Scheme Contract 1
Holmestown Waste Management Facility Landfill Cell Development Phase 2

The Phase 2 works consist of the construction of engineered landfill cells with a footprint area approximately 17,500 m². Works will include excavation of 77,000 m³ insitu clay material...

read more »
Holmestown Waste Management Facility Landfill Cell Development Phase 2
Shewalton Landfill Development Phase 4 Cell Construction, Capping Works and Construction of Access Road

The works comprise of the development of part of the Shewalton Site for use as a new landfill containment cell, capping an existing filled cell, construction of a surface water drainage system and...

read more »
Shewalton Landfill Development Phase 4 Cell Construction, Capping Works and Construction of Access Road
Croy Earthworks Contract

Tree shredding and removal Stripping 5000m3 of existing topsoil and subsoil and stockpiling for reinstatement work Excavation of 30,000m3 of spoil and regrading an area of 2 hectares Placing and...

read more »
Croy Earthworks Contract
JAMESON ROAD CELL 4 LINING WORKS

Construction of a new Landfill Cell with a containment area of 20,900m2 CONSTRUCTION ELEMENT INCLUDED CONSTRUCTION OF CONTAINMENT BUND Excavation of 4615m3 of stockpiled UA material and processing...

read more »
JAMESON ROAD CELL 4 LINING WORKS
WHINNEY HILL LANDFILL SITE PHASE 7.3 CONSTRUCTION WORKS INCLUDING PHASE 7.1 & PHASE 7.2 LINK WORKS

THE PREPARATION OF PHASE 7.1 AND 7.2 LINK WORKS COMPRISED OF • Excavation and land forming • Earthworks to facilitate surface water management • The application of a composite...

read more »
WHINNEY HILL LANDFILL SITE PHASE 7.3 CONSTRUCTION WORKS INCLUDING PHASE 7.1 & PHASE 7.2 LINK WORKS