All Projects

EARTHWORKS

M3 Clonee to North of Kells Earthworks

The M3 motorway is the largest PPP motorway project undertaken in Ireland. Wills Bros Ltd was engaged as the specialist earthworks contractor by the main contractor for 32km (over 50%) of the project...

read more »
M3 Clonee to North of Kells Earthworks
M50 Upgrade Scheme Contract 1

The M50 Upgrade Scheme involved the provision of a third lane in each direction and the change of all signalized grade separated interchanges to fully free-flow junctions. Contract 1 involved the...

read more »
M50 Upgrade Scheme Contract 1
Holmestown Waste Management Facility Landfill Cell Development Phase 2

The Phase 2 works consist of the construction of engineered landfill cells with a footprint area approximately 17,500 m². Works will include excavation of 77,000 m³ insitu clay material...

read more »
Holmestown Waste Management Facility Landfill Cell Development Phase 2
Shewalton Landfill Development Phase 4 Cell Construction, Capping Works and Construction of Access Road

The works comprise of the development of part of the Shewalton Site for use as a new landfill containment cell, capping an existing filled cell, construction of a surface water drainage system and...

read more »
Shewalton Landfill Development Phase 4 Cell Construction, Capping Works and Construction of Access Road
Croy Earthworks Contract

Tree shredding and removal Stripping 5000m3 of existing topsoil and subsoil and stockpiling for reinstatement work Excavation of 30,000m3 of spoil and regrading an area of 2 hectares Placing and...

read more »
Croy Earthworks Contract
JAMESON ROAD CELL 4 LINING WORKS

Construction of a new Landfill Cell with a containment area of 20,900m2 CONSTRUCTION ELEMENT INCLUDED CONSTRUCTION OF CONTAINMENT BUND Excavation of 4615m3 of stockpiled UA material and processing...

read more »
JAMESON ROAD CELL 4 LINING WORKS
WHINNEY HILL LANDFILL SITE PHASE 7.3 CONSTRUCTION WORKS INCLUDING PHASE 7.1 & PHASE 7.2 LINK WORKS

THE PREPARATION OF PHASE 7.1 AND 7.2 LINK WORKS COMPRISED OF • Excavation and land forming • Earthworks to facilitate surface water management • The application of a composite...

read more »
WHINNEY HILL LANDFILL SITE PHASE 7.3 CONSTRUCTION WORKS INCLUDING PHASE 7.1 & PHASE 7.2 LINK WORKS

ROAD AND BRIDGE CONSTRUCTION

Firhouse Road Realignment – Contract B

The Firhouse Road Realignment Contract B involved the realignment and reconstruction of 1.5 km of urban road. The new alignment consisted of a 10.5 m wide carriageway, 2.0 m grass verges, 1.75 m...

read more »
Firhouse Road Realignment – Contract B
N5 Realignment- Scramoge to Cloonmore

Realignment of 8km of the N5 National Primary Road between Scramoge and Cloonmore, County Roscommon. Principal elements included: 8.3km of mainline construction 2 river bridges 1 rail...

read more »
N5 Realignment- Scramoge to Cloonmore
M6 Ballinasloe to Athlone Dual Carriageway

Main Contract for the design and construction of a 2 lane motorway between the towns of Athlone and Ballinasloe. It consists of 20 km of dual carriageway constructed to motorway standard, 4 km of...

read more »
M6 Ballinasloe to Athlone Dual Carriageway
M18 Gort to Crusheen Dual Carriageway

Main Contract for the design and construction of a 22.3km, 2 lane motorway bypassing the towns of Crusheen and Gort in counties Clare and Galway. Principal elements also include 2 grade separated...

read more »
M18 Gort to Crusheen Dual Carriageway
Reconstruction of Owroe Bridge

The demolition of the existing Owroe Bridge and construction of a new river bridge. The new deck consists of pre – cast bridge beams in-filled with in-situ reinforced concrete. The...

read more »
Reconstruction of Owroe Bridge
N5 Charlestown Bypass

Design and construction of 18.2km standard single carriageway national primary road. The scope of the works included the realignment of 5km of various single carriageway roads; 2 No. grade separated...

read more »
N5 Charlestown Bypass
N15 Bundoran / Ballyshannon Bypass

The N15 Bundoran / Ballyshannon Bypass project consisted of design and construction of approximately 11km of 10.0m Wide Single Carriageway National Primary Road, 1.0km of single 2-way carriageway at...

read more »
N15 Bundoran / Ballyshannon Bypass
IDA Ireland Athenry Strategic Site Infrastructure Works Phase 01Roadworks

The works connect the N6 Galway to East Ballinasloe scheme, currently under construction, to the R348 Regional Road. Haul Route/Accommodation Road, 0.915Km in Length, 5 metre wide Carriageway...

read more »
IDA Ireland Athenry Strategic Site Infrastructure Works Phase 01Roadworks
Construction of Sonnagh River Bridge, Realignment of Local Road & Associated Works

Demolition and removal of an existing road bridge crossing of the Sonnagh River and existing walls and fences. Construction of a new concrete bridge over the River Sonnagh, a single span structure...

read more »
Construction of Sonnagh River Bridge, Realignment of Local Road & Associated Works
Realignment of the N59 at Derrylea

The Realignment of the N59 at Derrylea will consist of 3.8km of road to be constructed in the townlands of Gowlan West and Derrylea, Co. Galway. The scheme consists of: 3800 linear metres of 6.5m...

read more »
Realignment of the N59 at Derrylea
Blakestown QBC

Upgrade of Blakestown Way to incorporate a south bound bus corridor and upgrade of footway and cycleway facilities. To include site clearance removal of old footpath, installation of new services...

read more »
Blakestown QBC
N22&N71 Pavement and Minor Works Contract 2009

Pavement Scarification Road Reconstruction and Repair Road Markings

read more »
N22&N71 Pavement and Minor Works Contract 2009
N22&N25 Pavement and Minor Works Contract 2009

Pavement Scarification Road Reconstruction and Repair Road Markings

read more »
N22&N25 Pavement and Minor Works Contract 2009
Carrigaline Cycle Network Scheme

Upgrading and repair to pedestrian footpaths and cycle tracks in Carrigaline.

read more »
Carrigaline Cycle Network Scheme
N52 Ardcroney

Overlay contract including planing when required, surface dressing, laying of new kerbing and footpaths, road markings and reflective studs.

read more »
N52 Ardcroney
WATERFORD CITY ACCESS ROUTES - CONTRACT NO.1 (OLD TRAMORE ROAD)

The scheme involves the construction of footpaths, the upgrading of the existing road surface and road widening. Physical works on the Old Tramore Road extend over a length of 1200m. The works...

read more »
WATERFORD CITY ACCESS ROUTES - CONTRACT NO.1 (OLD TRAMORE ROAD)
N6 Athlone Relief Road Overlay & Rehabilitation 2010

The project involves the upgrading and overlaying of the existing pavement on a 12.7 km section of the N6 National Primary Route, a 100kph dual carriageway in an semi-urban environment with high...

read more »
N6 Athlone Relief Road Overlay & Rehabilitation 2010
A855 Portree to Staffin - Phase III - Isle of Skye (Scotland)

The project consists of the widening of an existing single track road into 6m wide two lane single carriageway road.  Works also include the removal of 7 cross carrigeway culverts and replacement...

read more »
A855 Portree to Staffin - Phase III - Isle of Skye (Scotland)
Leinster Bridges Rehabilitation Contract No.5 Part 1 Brigdes in Longford & Westmeath

Creggy Bridge is located approximately 3km south west of Ballymahon, Westmeath. The bridge is a single span structure which carries the N55 single carriageway over the Creggy River. Works included...

read more »
Leinster Bridges Rehabilitation Contract No.5 Part 1 Brigdes in Longford & Westmeath
A92 Eden Bridge Drainage Works

Carriageway and drainage works carried out on the A92 in Fife from the Eden Bridge southbound. Earthworks to strengthen carriageway foundations. It involved excavations up to 2-3m deep and...

read more »
A92 Eden Bridge Drainage Works
N5 Longford Bypass Design & Build Scheme

The N5 Longford Bypass road project will be constructed approximately 2km from Longford Town in the townlands of Aghareagh, Ballyminion, Mullagh, Cartrons, Moneylagan and Aghadegnan. The Project will...

read more »
N5 Longford Bypass Design & Build Scheme
R112 QUALITY BUS CORRIDOR UPPER CHURCHTOWN ROAD

Construction of a quality bus corridor on upper Churchtown Road, Dublin from the junction of Nutgrove Ave to Taney Bridge. The construction involved road widening works, new drainage, the local...

read more »
R112 QUALITY BUS CORRIDOR UPPER CHURCHTOWN ROAD
HUNTSTOWN WAY QUALITY BUS CORRIDOR

Construction works consisted of the reconfiguration of an existing roundabout at the junction of Blakestown Road and Blakestown Way to a Four Arm Signalled Control Junction. Reassignment of the...

read more »
HUNTSTOWN WAY QUALITY BUS CORRIDOR
2010 VMS FOUNDATION CONSTRUCTION SCHEME

The construction of 25 foundations for Variable Message Sign (VMS) gantries at locations on the National Road Network and ancillary works which involved Major Traffic Management installations at all...

read more »
2010 VMS FOUNDATION CONSTRUCTION SCHEME

WATER AND SEWERAGE

Ballyshannon Sewerage Scheme

This contract involved the construction of the Ballyshannon Sewerage Scheme which included 17km of new pipework in the town of Ballyshannon. The new pipes were laid in busy streets while maintaining...

read more »
Ballyshannon Sewerage Scheme
Clontarf Combined Sewers Overflow Tanks

The construction of a temporary storage facility, within the confines of Clontarf Golf Club. Work included the installation of combined sewers in storm conditions and consisted of an R.C. storage tank...

read more »
Clontarf Combined Sewers Overflow Tanks
Carlow Town Surface Water Drainage Scheme, Flood Relief Scheme Phase A and Water Conservation Project Phase 2

Upgrading of the existing sewerage network by constructing new storm and foul sewer lines, surface water and overflow chambers and pumping stations around the town of Carlow.   Watermain...

read more »
Carlow Town Surface Water Drainage Scheme, Flood Relief Scheme Phase A and Water Conservation Project Phase 2
Killooman-Ballinagleragh Water Supply Project

The project encompassed the construction of: • 3 No reinforced concrete reservoirs were constructed. The reservoirs consist of pre-cast concrete wall panels, columns and insitu base, ring beam...

read more »
Killooman-Ballinagleragh Water Supply Project
Glenbeg Water Treatment Works

Construction of a new Water Treatment Plant and associated site works to treat the water supplied to Castletownbere and its environs. The proposed development is to be located in lands West of...

read more »
Glenbeg Water Treatment Works
A92 Eden Bridge Drainage Works

Carriageway and drainage works carried out on the A92 in Fife from the Eden Bridge southbound. Earthworks to strengthen carriageway foundations. It involved excavations up to 2-3m deep and...

read more »
A92 Eden Bridge Drainage Works
Carysfort - Maretimo Stream Improvement Scheme

The Carysfort Maretimo Stream has caused a number of severe flooding incidents in the past decade. The most recent flooding events have occurred on the 17th July 2007 and the 2nd July 2009. The...

read more »
Carysfort - Maretimo Stream Improvement Scheme
WHINNEY HILL LANDFILL SITE PHASE 7.3 CONSTRUCTION WORKS INCLUDING PHASE 7.1 & PHASE 7.2 LINK WORKS

THE PREPARATION OF PHASE 7.1 AND 7.2 LINK WORKS COMPRISED OF • Excavation and land forming • Earthworks to facilitate surface water management • The application of a composite...

read more »
WHINNEY HILL LANDFILL SITE PHASE 7.3 CONSTRUCTION WORKS INCLUDING PHASE 7.1 & PHASE 7.2 LINK WORKS

INDUSTRIAL AND COMMERCIAL

Ballina Beverages Concentrate Plant – Civil Works

The initial contract was the site enabling works for the construction of the largest soft drinks concentrate plant (45,000 m2) in Europe from a Greenfield site in Ballina, Co. Mayo. The scope of works...

read more »
Ballina Beverages Concentrate Plant – Civil Works
ESB Peaking Capacity Generating Station at Tawnaghmore, County Mayo

This project involved the construction of a 600m3 reinforced concrete foundation base, to receive a 50MW Pratt and Whittney generator. The base was constructed in one continuous pour, which included...

read more »
ESB Peaking Capacity Generating Station at Tawnaghmore, County Mayo
IRISH GYPSUM LTD. PRODUCTION STRIPS

Production strip at Knocknacran Opencast Mine, Co. Monaghan. involving the removal of large volumes of overburden The main construction elements were: Excavation of 6,984,300 m3 of...

read more »
IRISH GYPSUM LTD. PRODUCTION STRIPS
Lisheen Mine Tailings Dam – Stage 2

This contract involved the raising of the existing Tailings Management Facility (TMF) for the lead and zinc mine by increasing the height of the dam around its perimeter on its downstream. The raise...

read more »
Lisheen Mine Tailings Dam – Stage 2
Roscommon Business and Technology Park Phase 1

This project involved the construction of new Business and Technology Park for the I.D.A. on a greenfield site in Roscommon town. Work involved the provision of a new central spine access road through...

read more »
Roscommon Business and Technology Park Phase 1
Wexford Business and Technology Park

Contract for the expansion and upgrade of the existing IDA business park. Works included the extension of the park access roads, provision of cycleways and footpaths, boundary wall construction and...

read more »
Wexford Business and Technology Park

LANDFILL

Coolcashlagh Landfill

Construction of 35,000m2 of permanent cap to Coolcashlagh Landfill in Killarney, Co. Kerry. The main elements of the project included 16,000m3 of earthworks re-profiling to existing body of...

read more »
Coolcashlagh Landfill
Drumaboden Landfill

The main works consisted of: Re-grading of existing waste to form sloped batters and longitudinal gradients to facilitate surface water drainage. Filling of 900m of existing leachate...

read more »
Drumaboden Landfill
North Kerry Landfill

The project involved the permanent cap of 2 no. landfill cells and the construction of 2 no. new landfill cells. The main elements of the capping works included 20,000m2 of regulating of existing...

read more »
North Kerry Landfill
Holmestown Waste Management Facility Landfill Cell Development Phase 2

The Phase 2 works consist of the construction of engineered landfill cells with a footprint area approximately 17,500 m². Works will include excavation of 77,000 m³ insitu clay material...

read more »
Holmestown Waste Management Facility Landfill Cell Development Phase 2
Shewalton Landfill Development Phase 4 Cell Construction, Capping Works and Construction of Access Road

The works comprise of the development of part of the Shewalton Site for use as a new landfill containment cell, capping an existing filled cell, construction of a surface water drainage system and...

read more »
Shewalton Landfill Development Phase 4 Cell Construction, Capping Works and Construction of Access Road
Kinsale Road Landfill - Contract 10 (Landfill Capping)

The project involves capping approximately 90,000ms of landfill at Kinsale Road, Cork. The work take place in 2No capping phases (10a and10b) in 2010 and 2011. The works include all permanent and...

read more »
Kinsale Road Landfill - Contract 10 (Landfill Capping)
JAMESON ROAD CELL 4 LINING WORKS

Construction of a new Landfill Cell with a containment area of 20,900m2 CONSTRUCTION ELEMENT INCLUDED CONSTRUCTION OF CONTAINMENT BUND Excavation of 4615m3 of stockpiled UA material and processing...

read more »
JAMESON ROAD CELL 4 LINING WORKS
WHINNEY HILL LANDFILL SITE PHASE 7.3 CONSTRUCTION WORKS INCLUDING PHASE 7.1 & PHASE 7.2 LINK WORKS

THE PREPARATION OF PHASE 7.1 AND 7.2 LINK WORKS COMPRISED OF • Excavation and land forming • Earthworks to facilitate surface water management • The application of a composite...

read more »
WHINNEY HILL LANDFILL SITE PHASE 7.3 CONSTRUCTION WORKS INCLUDING PHASE 7.1 & PHASE 7.2 LINK WORKS

LEISURE AND PUBLIC AMENITY

Cornelscourt Village Renewal Scheme

Streetscape contract for Dun-Laoghaire Rathdown County Council. Works encompassed the removal of existing pavements, walls and large trees in a very confined site area. The reconstruction involved the...

read more »
Cornelscourt Village Renewal Scheme
Lucan Weir and Promenade

This contract involved the construction of a weir and promenade along the river Liffey in Dublin. Construction involved site clearance, the demolition of the existing riverbank wall, the placement...

read more »
Lucan Weir and Promenade
Development of Kilbarry Cemetery

The project consists of the redevelopment of an existing 4 acre site previously used as a builder’s waste dump. This project requires the redevelopment of the site to accommodate 1500 graves and...

read more »
Development of Kilbarry Cemetery
Carrigeen Civic Amenity Centre

Contract includes the construction of a new civic amenity site at Garigeen, Clonmel. The works comprise of the construction of: administration block site circulation routes yard...

read more »
Carrigeen Civic Amenity Centre
Carysfort - Maretimo Stream Improvement Scheme

The Carysfort Maretimo Stream has caused a number of severe flooding incidents in the past decade. The most recent flooding events have occurred on the 17th July 2007 and the 2nd July 2009. The...

read more »
Carysfort - Maretimo Stream Improvement Scheme
STEPASIDE ALL WEATHER PITCH

The contract involves the construction of an all weather pitch to accommodate both GAA and soccer on 13,395m2 of 3rd generation synthetic turf at the Eight Acre Field in Stepaside, Co...

read more »
STEPASIDE ALL WEATHER PITCH

SPECIALIST SERVICES

Wick Drain Installation

Wills Bros Ltd., are the only Irish contractor providing wick drain installation services. Examples of previous projects N5 Scramoge to Cloonmore Road Realignment (50,000m) St. Johns...

read more »
Wick Drain Installation
Subbase Laying

Wills Bros Ltd., were the first Irish Contractor to equip their grader fleet with ATS Blade control systems for accurate and efficient laying of subbase and capping layers. In addition to carrying out...

read more »
Subbase Laying
Pavement & Surfacing

In addition to self sufficiency in earthworks we also own and operate a Benninghoven MBA 2000 mobile asphalt batching plant. This a 200 tonne per hour plant capable of producing the full range of...

read more »
Pavement & Surfacing

MARINE AND COASTAL

Whiddy Island Slipway Construction

Construction of a 50m mass concrete slipway with the construction of 150m of entrance road and carpark. The slipway and retaining walls were constructed within a 5m tidal zone. This required a 7m...

read more »
Whiddy Island Slipway Construction
Gyleen Costal Erosion

Construction of RC Wall on foreshore at base of eroded cliff face and construction of gabion wall on top of RC wall. Backfill from gabion wall to top of cliff face.

read more »
Gyleen Costal Erosion
Tarmonbarry Marina Development

Civil works contract for the construction of a 90 berth marina adjacent to the River Shannon in the Village of Tarmonbarry. Construction involved the excavation of 40,000m3 in the marina and...

read more »
Tarmonbarry Marina Development
Carysfort - Maretimo Stream Improvement Scheme

The Carysfort Maretimo Stream has caused a number of severe flooding incidents in the past decade. The most recent flooding events have occurred on the 17th July 2007 and the 2nd July 2009. The...

read more »
Carysfort - Maretimo Stream Improvement Scheme